|
|
Starting the Electronics Center
Date: 04/10/2008
Views: 36
|
|
|
|
Electronics Center Case
Date: 04/10/2008
Views: 33
|
|
|
|
Printed Circuit Supports
Printed pircuit supports under construction
Date: 04/10/2008
Views: 31
|
|
|
|
Printed Circuit Board Supports
Date: 04/10/2008
Views: 32
|
|
|
|
Terminal Block Manifold Strips
Strips for power supplies to electronic circuits
Date: 04/10/2008
Views: 33
|
|
|
|
Electronics Center Board
Starting to assemble the Electronics Center circuit board module
Date: 04/10/2008
Views: 40
|
|
|
|
Electronics-Board---II
The circuits support board is partially populated at this stage.
Date: 04/14/2008
Views: 59
|
|
|
|
Electronics Center Installed I
The electronics center installed in its permanent home
Date: 12/02/2008
Views: 34
|
|
|
|
Electronics Center Installed II
The electronics center pulls out on ball-bearing drawer slides
Date: 12/02/2008
Views: 36
|
|
|
|
Tuning a Throttle
Each throttle needed preliminary tuning before connecting to tracks.
Date: 02/21/2009
Views: 38
|
|